January 2024
In January, we continue the work in the Farmers’ Tower with various essential tasks such as dismantling floor plates, asbestos removal, and concrete pouring. Additionally, the vapour barrier for the roofs and rooftop terraces of the tower section has been installed.
Enjoy the first images of the year with us!